BiBTeX citation export for MOIAA05: Commissioning of the Second JLAB C75 Cryomodule & Performance Evaluation of Installed C75 Cavities

@inproceedings{mccaughan:srf2023-moiaa05,
  author       = {M.D. McCaughan and G. Ciovati and G.K. Davis and M.A. Drury and T. Powers and A.V. Reilly},
  title        = {{Commissioning of the Second JLAB C75 Cryomodule & Performance Evaluation of Installed C75 Cavities}},
% booktitle    = {Proc. SRF'23},
  booktitle    = {Proc. 21th Int. Conf. RF Supercond. (SRF'23)},
  pages        = {14--18},
  eid          = {MOIAA05},
  language     = {english},
  keywords     = {cavity, cryomodule, SRF, plasma, controls},
  venue        = {Grand Rapids, MI, USA},
  series       = {International Conference on RF Superconductivity},
  number       = {21},
  publisher    = {JACoW Publishing, Geneva, Switzerland},
  month        = {09},
  year         = {2023},
  issn         = {2673-5504},
  isbn         = {978-3-95450-234-9},
  doi          = {10.18429/JACoW-SRF2023-MOIAA05},
  url          = {https://jacow.org/srf2023/papers/moiaa05.pdf},
  abstract     = {{JLAB has long been a hub of SRF technology with the CEBAF accelerator as one of its first large scale adopters. As SRF technology has advanced, the C50 and C100 programs have allowed for the extension of CEBAF’s total energy to 6 GeV and nearly 12 GeV respectively. Along with the increase in energy reach, rates of accelerating gradient degradation have been extracted for these cryomodule designs. A plan to mitigate these losses & maintain robust gradient headroom to deliver the 12 GeV program ¿ the CEBAF Performance Plan¿ established a multi-year effort of cryomodule refurbishments and replacements. Part of this plan included a cost optimization of the C50 program with more modern processing techniques and the replacement of existing cavities with larger grain boundary cavities produced from ingot Niobium (dubbed C75 for 75 MeV gain). Reports have been made on the prototype pair of C75 cavities installed in a C50 cryomodule and the first full C75 cryomodule installed in 2017 and 2021. This paper reports on the results from the qualification of the cavities for the second C75 module in both a vertical cryostat and the commissioning results of the cryomodule in the CEBAF tunnel.}},
}