|
- N. Bazin, S. Berry, J. Drant, M. Fontaine, P. Garin, H. Jenhani, A. Raut, P. Sahuquet, C. Simon
CEA-DRF-IRFU, France
- J. Belorgey, Q. Bertrand, P. Brédy, E. Cenni, C. Cloué, R. Cubizolles, S. Ladegaillerie, A. Le Baut, A. Moreau, O. Piquet, J. Plouin
CEA-IRFU, Gif-sur-Yvette, France
|
|
|
The Proton Improvement Plan II (PIP-II) that will be installed at Fermilab is the first U.S. accelerator project that will have significant contributions from international partners. CEA joined the international collaboration in 2018 and will deliver 10 low-beta cryomodules as In-Kind Contributions to the PIP-II project, with cavities supplied by LASA-INFN (Italy) and VECC-DAE (India), and power couplers and tuning systems supplied by Fermilab. An important milestone was reached in March 2023 with the Final Design Review of the cryomodule, launching the pre-production phase. This paper presents the status CEA activities on the design, manufacturing, assembly and tests of the cryomodules and the upgrade of the existing infrastructures to the PIP-II requirements.
|
|