Paper |
Title |
Page |
MOPMB055 |
CEA Contribution to the PIP-II Linear Accelerator |
234 |
|
- N. Bazin, S. Berry, J. Drant, M. Fontaine, P. Garin, H. Jenhani, A. Raut, P. Sahuquet, C. Simon
CEA-DRF-IRFU, France
- J. Belorgey, Q. Bertrand, P. Brédy, E. Cenni, C. Cloué, R. Cubizolles, S. Ladegaillerie, A. Le Baut, A. Moreau, O. Piquet, J. Plouin
CEA-IRFU, Gif-sur-Yvette, France
|
|
|
The Proton Improvement Plan II (PIP-II) that will be installed at Fermilab is the first U.S. accelerator project that will have significant contributions from international partners. CEA joined the international collaboration in 2018 and will deliver 10 low-beta cryomodules as In-Kind Contributions to the PIP-II project, with cavities supplied by LASA-INFN (Italy) and VECC-DAE (India), and power couplers and tuning systems supplied by Fermilab. An important milestone was reached in March 2023 with the Final Design Review of the cryomodule, launching the pre-production phase. This paper presents the status CEA activities on the design, manufacturing, assembly and tests of the cryomodules and the upgrade of the existing infrastructures to the PIP-II requirements.
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-SRF2023-MOPMB055
|
|
About • |
Received ※ 25 June 2023 — Revised ※ 26 June 2023 — Accepted ※ 27 June 2023 — Issue date ※ 03 July 2023 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOPMB057 |
Implementation of the Test Bench for the PIP-II LB650 Cryomodules at CEA |
243 |
|
- H. Jenhani, N. Bazin, Q. Bertrand, P. Brédy, L. Maurice, O. Piquet, P. Sahuquet, C. Simon
CEA-IRFU, Gif-sur-Yvette, France
|
|
|
The Proton Improvement Plan II (PIP-II) at Fermilab is the first U.S. accelerator project that will have significant contributions from international partners. As a part of the French In-Kind Contributions to this project, CEA will provide ten 650 MHz low-beta cryomodules (LB650) equipped with LASA-INFN (Italy) and VECC-DAE (India) cavities and Fermilab power couplers and RF tuning systems. CEA is accordingly in charge of the design, manufacturing, assembly and testing of these cryomodules. This paper presents the future implementation of the test stand dedicated to the cryogenic and RF power testing of the LB650 cryomodules. The choice of the equipment and the current status will be detailed, as well.
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-SRF2023-MOPMB057
|
|
About • |
Received ※ 19 June 2023 — Revised ※ 23 June 2023 — Accepted ※ 26 June 2023 — Issue date ※ 05 July 2023 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|