WEPWB096 |
Testing of PIP-II Pre-production 650 MHz Couplers in Warm Test Stand and Cryomodule |
812 |
|
- N. Solyak, S.K. Chandrasekaran, B.M. Hanna, J. Helsper, J.P. Holzbauer, S. Kazakov, A.I. Sukhanov
Fermilab, Batavia, Illinois, USA
|
|
|
650 MHz fundamental power couplers were developed for PIP-II project to deliver RF power for low-beta and high-beta elliptical cavities. Few prototypes were built and tested and after some modification we built 8 pre-production couplers (with three spares for vacuum side) for ppHB650 cryomodule. All couplers were successfully tested in pulse mode (up to 100kW) and in CW mode (up to 50kW) in test stand at full reflection at 8 phases. In baseline configuration with DC bias we do not see any multipactoring activity after short processing. We also tested power processing without bias for uncoated and TiN coated ceramic window. Results of these studies presented in this paper. One of the coupler was assembled on LB650 cavity and tested at cryogenic environment in STC cryostat at ~30kW power with full reflection at different reflection phase. We also demonstrated good result from power processing without bias for warm and cold cavity. Six couplers were assembled on HB650 cavities in pre-production cryomodule. Test results from cryomodule qualification is discussing in this paper.
|
|
|
Poster WEPWB096 [2.748 MB]
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-SRF2023-WEPWB096
|
|
About • |
Received ※ 19 June 2023 — Revised ※ 25 June 2023 — Accepted ※ 27 June 2023 — Issue date ※ 17 July 2023 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPWB097 |
Testing and Processing of Pre-production 325 MHz Single Spoke Resonator Power Couplers for PIP-II Project |
816 |
|
- N. Solyak, B.M. Hanna, J. Helsper, S. Kazakov, D. Passarelli
Fermilab, Batavia, Illinois, USA
- S. Wallon
Université Paris-Saclay, CNRS/IN2P3, IJCLab, Orsay, France
|
|
|
Fundamental 325 MHz power couplers are designed, built and tested for SSR cavities in PIP-II project [1]. Couplers should work in CW mode at power level 7.5kW w/o beam and ~15 kW with the 2 mA beam. At pre-production stage we built and tested 6 couplers, produced by CPI (FNAL) and PMB (IJCLab) and 4 more couplers will be tested soon. Two of tested cou-plers had TiN coated ceramic window. In warm test stand two couplers were mounted on the coupling chamber and tested in SW regime at full reflection with phase controlled by position of short and reflection insert. Couplers were tested at pulse mode (up to 25kW) and cw mode (12kW) with HV bias or without bias. Test results demonstrated that 3.5 kV DC bias completely suppresses multipactor in coupler. Vacuum activity in coupler was controlled by e-pickups and build-in vacuum gauges, located near the vacuum side of window. Power processing without DC bias was done for several couplers with and without TiN coating on ceramic window. Test results are presented and discussing in paper.
|
|
|
Poster WEPWB097 [2.439 MB]
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-SRF2023-WEPWB097
|
|
About • |
Received ※ 19 June 2023 — Revised ※ 25 June 2023 — Accepted ※ 27 June 2023 — Issue date ※ 29 June 2023 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|