Paper | Title | Page |
---|---|---|
WEPWB120 | Flux Expulsion Testing for LCLS-II-HE Cavity Production | 876 |
|
||
Nitrogen-doped niobium SRF cavities are sensitive to trapped magnetic flux, which decreases the cavity intrinsic Q₀. Prior experimental results have shown that heat treatments to 900°C and higher can result in stronger flux expulsion during cooldown; the precise temperature required tends to vary by vendor lot/ingot of the niobium material used in the cavity cells. For LCLS-II-HE, to ensure sufficient flux expulsion in all cavities, we built and tested single-cell cavities to determine this required temperature for each vendor lot of niobium material to be used in cavity cells. In this report, we present the results of the single-cell flux expulsion testing and the Q₀ of the nine-cell cavities built using the characterized vendor lots. We discuss mixing material from different vendor lots, examine the lessons learned, and finally present an outlook on possible refinements to the single-cell technique. | ||
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2023-WEPWB120 | |
About • | Received ※ 15 June 2023 — Revised ※ 28 June 2023 — Accepted ※ 03 July 2023 — Issue date ※ 13 July 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
MOPMB063 | Multipacting Processing in Cryomodules for LCLS-II and LCLS-II-HE | 259 |
|
||
Funding: This manuscript has been authored by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy, Office of Science, Office of High Energy Physics. Multipacting (MP) is a phenomenon which can affect stability in particle accelerators and limit performance in superconducting radio frequency cavities. In the TESLA shaped, 1.3 GHz, 9-cell cavities used in the LCLS-II (L2) and LCLS-II-HE (HE) projects, the MP-band (~17-24 MV/m) lies within the required accelerating gradients. For HE, the operating gradient of 20.8 MV/m lies well within the MP-band and cryomodule testing has confirmed that this is an issue. As such, MP processing for the HE cryomodule test program will be discussed. Early results on MP processing in cryomodules installed in the L2 linac will also be presented, demonstrating that the methods used in cryomodule acceptance testing are also successful at conditioning MP in the accelerator and that this processing is preserved in the mid-term. |
||
Poster MOPMB063 [1.066 MB] | ||
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2023-MOPMB063 | |
About • | Received ※ 25 June 2023 — Revised ※ 27 June 2023 — Accepted ※ 28 June 2023 — Issue date ※ 30 June 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
MOPMB072 | LCLS-II-HE Cavity Qualification Testing | 279 |
|
||
Acceptance testing of the LCLS-II-HE production cavities is approximately 65% complete. In this report, we present details of the test results, including summaries of the quench fields, intrinsic quality factors, and experience with field emission. We also offer an outlook on the remaining tests to be performed. | ||
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2023-MOPMB072 | |
About • | Received ※ 20 June 2023 — Revised ※ 28 June 2023 — Accepted ※ 03 July 2023 — Issue date ※ 07 July 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
MOPMB074 | Cryomodule Storage for LCLS-II HE | 282 |
|
||
Funding: U.S. Department of Energy The Linac Coherent Light Source-II High Energy (LCLS-II HE) project will upgrade the superconducting LCLS-II with 23 additional cryomodules, increasing the beam energy from 4 GeV to 8 GeV. Due to the user schedule of the existing linac, Cryomodules arriving at SLAC cannot immediately be installed in the linac. They are scheduled to be stored for up to three years before the 12-month installation window. During this storage period, the risk of damage to Cryomodules prior to installation will be mitigated with procedures and best practices incorporating experience from LCLS-II. |
||
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2023-MOPMB074 | |
About • | Received ※ 25 June 2023 — Revised ※ 28 June 2023 — Accepted ※ 03 July 2023 — Issue date ※ 10 July 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |