Author: Vandygriff, D.J.
Paper Title Page
MOIXA03 Proton Power Upgrade Project Progress and Plans at the Spallation Neutron Source in Oak Ridge Tennessee 25
 
  • J.D. Mammosser, M.J. Dayton, D.D. Kraft, R. Maekawa, L. Pinion, B.E. Robertson
    ORNL RAD, Oak Ridge, Tennessee, USA
  • R. Afanador, D.L. Barnhart, M.S. Champion, B. DeGraff, M. Doleans, J. Galambos, S.W. Gold, M.N. Greenwood, G.A. Hine, M.P. Howell, S.-H. Kim, C.J. McMahan, P. Pizzol, S.E. Stewart, D.J. Vandygriff, D.M. Vandygriff
    ORNL, Oak Ridge, Tennessee, USA
  • A. Bitter, K.B. Bolz, A. Navitski, L. Zweibäumer
    RI Research Instruments GmbH, Bergisch Gladbach, Germany
  • E.F. Daly, G.K. Davis, P. Dhakal, J.F. Fischer, D. Forehand, N.A. Huque, K.M. Wilson
    JLab, Newport News, Virginia, USA
 
  Funding: Work Supported by UT-Battelle, LLC, under contract DE-AC05-00OR22725
The Proton Power Upgrade project is well underway at the Spallation Neutron Source (SNS) facility in Oak Ridge, Tennessee. This project aims at increasing the proton beam power capability from 1.4 to 2.8 MW, by adding linac energy, increasing the beam current and implementing target developments to handle the increased beam power. This talk will cover the current status of increasing the beam energy, issues encountered along the way, operational experience with the new SRF cryomodules and target improvements and results from operation with beam so far.
 
slides icon Slides MOIXA03 [3.327 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-SRF2023-MOIXA03  
About • Received ※ 09 June 2023 — Revised ※ 25 June 2023 — Accepted ※ 29 June 2023 — Issue date ※ 08 July 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)