MOIAA01 | FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives | 1 |
|
||
Funding: Work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661. After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. During the first 12 months of user operations, the FRIB accelerator complex delivered 5250 beam hours, including 1528 hours to nine science experiments conducted with primary beams of 36Ar, 48Ca, 70Zn, 82Se, 124Xe, and 198Pt at beam energies >200 MeV/u; 2724 hours for beam developments, studies, and tuning; and 998 hours to industrial users and non-scientific programs using the FRIB Single Event Effect (FSEE) beam line. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on FRIB status and progress since SRF2021, emphasizing lessons learned during the transition from beam commissioning to machine operations, challenges and resolutions for the power ramp-up, progress with accelerator improvements, and R&D for the energy upgrade. |
||
Slides MOIAA01 [7.037 MB] | ||
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2023-MOIAA01 | |
About • | Received ※ 20 June 2023 — Revised ※ 26 June 2023 — Accepted ※ 03 July 2023 — Issue date ※ 19 July 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
MOPMB084 | FRIB Driver Linac Integration to Support Operations and Protect SRF Cryomodules | 316 |
|
||
Funding: Work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661. The driver linac for the Facility for Rare Isotope Beams (FRIB) at Michigan State University includes 324 superconducting radio-frequency (SRF) cavities, and the SRF particle-free beamline spans approximately 300 meters. Protecting the beamlines against contamination is critical to FRIB operations, and thus, various administrative and engineered controls have been put in place to protect the SRF cryomodules. These controls include local vacuum interlocks for cryomodule isolation, accelerator-wide interlocks, and software controls to safeguard the cryomodules and beamlines. Meanwhile, efforts are being made to provide training and develop programs with the goal of preventing critical failures during maintenance. This paper discusses the measures and approaches used for both system integration to support operations and SRF beamline protection. |
||
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2023-MOPMB084 | |
About • | Received ※ 14 June 2023 — Revised ※ 23 June 2023 — Accepted ※ 26 June 2023 — Issue date ※ 18 July 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |