MOIAA01 | FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives | 1 |
|
||
Funding: Work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661. After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. During the first 12 months of user operations, the FRIB accelerator complex delivered 5250 beam hours, including 1528 hours to nine science experiments conducted with primary beams of 36Ar, 48Ca, 70Zn, 82Se, 124Xe, and 198Pt at beam energies >200 MeV/u; 2724 hours for beam developments, studies, and tuning; and 998 hours to industrial users and non-scientific programs using the FRIB Single Event Effect (FSEE) beam line. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on FRIB status and progress since SRF2021, emphasizing lessons learned during the transition from beam commissioning to machine operations, challenges and resolutions for the power ramp-up, progress with accelerator improvements, and R&D for the energy upgrade. |
||
Slides MOIAA01 [7.037 MB] | ||
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2023-MOIAA01 | |
About • | Received ※ 20 June 2023 — Revised ※ 26 June 2023 — Accepted ※ 03 July 2023 — Issue date ※ 19 July 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPTB016 | Summary of the FRIB Electropolishing Facility Design and Commissioning, Cavity Processing, and Cavity Test Results | 419 |
|
||
Funding: U.S. Department of Energy, Office of Science, Office of Nuclear Physics and used resources of the FRIB, which is a DOE Office of Science User Facility, under Award Number DE-SC0000661. Recently, a new Electropolishing (EP) facility was con-structed and commissioned at the Facility for Rare Isotope Beam (FRIB) with the purpose of supporting advanced surface processing techniques for SRF R&D activities. The FRIB production cavities opted for a Buffered Chemical Polish (BCP) method due to its cost effectiveness and was supported by successful outcomes in other facilities with low beta cavities in a similar frequency range. All 324 cavities used in FRIB Linac were processed in-house at MSU using BCP and exhibited satisfactory performance during testing. As part of the FRIB energy upgrade R&D, 5-cell 644 MHz elliptical resonators will be employed, desiring the use of EP and advanced techniques such as nitrogen doping and medium-T baking. The EP facility is designed to accommodate all types of cavities used in FRIB and possesses the capability for performing EP at low temperatures. Here we report the details of design and commissioning of the EP facility, highlights of encountered issues and subsequent improvements, and preliminary results from vertical tests conducted on the cavities. |
||
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2023-TUPTB016 | |
About • | Received ※ 15 June 2023 — Revised ※ 23 June 2023 — Accepted ※ 28 June 2023 — Issue date ※ 14 July 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |