Paper |
Title |
Page |
MOIXA06 |
Operational Experience with the European XFEL SRF Linac |
43 |
|
- Ch. Schmidt, M. Bousonville, J. Branlard, M. Diomede, S. Göller, D. Kostin, M. Scholz, V. Vogel (Fogel), N. Walker
DESY, Hamburg, Germany
|
|
|
The European X-ray Free Electron laser (EuXFEL) is a 3.4 km long research facility which generates ultrashort X-ray flashes of outstanding brilliance since 2017. Up to 27000 electron bunches per second are accelerated in a 1.3 km long superconducting radio frequency (SRF) linac to a maximum energy of 17.6 GeV. Within this time, operational experience with a pulsed RF machine has been gained and new operation modes simultaneously delivering electron bunches to 3 different SASE undulator beamlines have been successfully implemented. Recent activities on increasing the linac availability, power efficiency and duty cycle are discussed.
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-SRF2023-MOIXA06
|
|
About • |
Received ※ 19 June 2023 — Revised ※ 23 June 2023 — Accepted ※ 28 June 2023 — Issue date ※ 06 July 2023 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOPMB058 |
Summary of the Superconducting Rf Measurements in AMTF Hall at DESY |
248 |
|
- M. Wiencek, K. Kasprzak, D. Kostin, D. Reschke, L. Steder
DESY, Hamburg, Germany
|
|
|
The AMTF (Accelerator Module Test Facility) in DESY was built for the tests of all superconducting cavities and cryomodules for the EuXFEL linac. After successful commissioning of the EuXFEL, the AMTF has been adapted in order to perform SRF (super conducting radio frequency) measurements of cavities and accelerating modules for different projects. Several SRF cavities related projects are still ongoing, while other were just finished. Some of those projects are dedicated to test components for the infrastructure of accelerators which are under construction, while the other ones are devoted to new R&D paths aiming for cavities and modules with high performance which are under investigation at DESY. This paper describes present activities performed at AMTF with special emphasis on performing SRF measurements for the ongoing cavities production. Most of the presented data is related to vertical cryostat cavity testing. However, some data about cryomodules and a new coupler test stand will be shown as well. Detailed statistics about the number of vertical tests performed within the last two years are also presented.
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-SRF2023-MOPMB058
|
|
About • |
Received ※ 16 June 2023 — Revised ※ 23 June 2023 — Accepted ※ 26 June 2023 — Issue date ※ 02 July 2023 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOPMB082 |
SRF Accelerating Modules Upgrade for Flash Linac at DESY |
306 |
|
- D. Kostin, S. Barbanotti, J. Eschke, K. Jensch, N. Krupka, A. Muhs, D. Reschke, S. Saegebarth, J. Schaffran, P. Schilling, M. Schmökel, L. Steder, N. Steinhau-Kühl, A. Sulimov, E. Vogel, H. Weise, M. Wiencek, B. van der Horst
DESY, Hamburg, Germany
|
|
|
SRF accelerating modules with 8 TESLA-type 1.3 GHz SRF cavities are the main part of the linear accelerators currently in user operation at DESY, FLASH [1, 2] and the European XFEL [3, 4]. For the FLASH upgrade in 2022 [5] two accelerating modules have been exchanged in order to enhance the beam energy to 1.3 GeV. The two modules have been prototype modules for the European XFEL. After reassembly both modules were successfully tested and installed in the FLASH linac. Data taken during the commissioning at the end of 2022 did confirm the test results. This paper presents described efforts and their conclusions since last two years and continues the presentation given at SRF 2021 [6].
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-SRF2023-MOPMB082
|
|
About • |
Received ※ 16 June 2023 — Revised ※ 23 June 2023 — Accepted ※ 27 June 2023 — Issue date ※ 27 June 2023 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUIAA01 |
Twenty Years of Cryogenic Operation of the Flash Superconducting Linac |
347 |
|
- S. Barbanotti, DESY. Abassi, Y. Bozhko, K. Honkavaara, K. Jensch, D. Kostin, S. Lederer, T. Schnautz, S. Schreiber, A. Wagner, H. Weise
DESY, Hamburg, Germany
- J. Roßbach
University of Hamburg, Institut für Experimentalphysik, Hamburg, Germany
- J. Zajac
Linde Kryotechnik AG, Büro DESY Hamburg, Hamburg, Germany
|
|
|
The FLASH superconducting linac is in operation at DESY since more than 20 years. Many changes and upgrades took place to transform a test stand for single cryomodules to a successful free electron laser. We summarize here the main steps of the FLASH history from the cryogenic point of view including the latest major upgrade that took place in 2022. We also give an overview of cryomodule performances like cavity gradient and heat load measurements and their evolution over the time.
|
|
|
Slides TUIAA01 [6.861 MB]
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-SRF2023-TUIAA01
|
|
About • |
Received ※ 16 June 2023 — Revised ※ 24 June 2023 — Accepted ※ 26 June 2023 — Issue date ※ 20 July 2023 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPWB092 |
Test-Stand for Conditioning of Fundamental Power Couplers at DESY |
797 |
|
- K. Kasprzak, Th. Buettner, A. Gössel, D. Klinke, D. Kostin, C. Müller, E. Vogel, M. Wiencek
DESY, Hamburg, Germany
|
|
|
During the construction of the European-XFEL, activities related to Fundamental Power Couplers (FPCs) were outsourced to external partners and the former FPC test-stand area at DESY was given up due to infrastructure rearrangements. For the study of various XFEL upgrade scenarios a new test-stand for conditioning of FPCs at DESY is required. It will be used for evaluation of new coupler preparation methods with particular emphasis on Continuous Wave (CW) and long RF pulse operation. The new test-stand has been recently commissioned. Four FPCs have been prepared and tested. RF pulses were applied to the couplers, starting with the shortest possible pulse and increasing it’s power until maximum power was reached. The process was repeated with several pulse lengths until the maximum RF pulse length was reached. A review of the commissioning and first operation experience of the RF system are presented here.
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-SRF2023-WEPWB092
|
|
About • |
Received ※ 15 June 2023 — Revised ※ 24 June 2023 — Accepted ※ 26 June 2023 — Issue date ※ 16 July 2023 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|