TUPTB016 | Summary of the FRIB Electropolishing Facility Design and Commissioning, Cavity Processing, and Cavity Test Results | 419 |
|
||
Funding: U.S. Department of Energy, Office of Science, Office of Nuclear Physics and used resources of the FRIB, which is a DOE Office of Science User Facility, under Award Number DE-SC0000661. Recently, a new Electropolishing (EP) facility was con-structed and commissioned at the Facility for Rare Isotope Beam (FRIB) with the purpose of supporting advanced surface processing techniques for SRF R&D activities. The FRIB production cavities opted for a Buffered Chemical Polish (BCP) method due to its cost effectiveness and was supported by successful outcomes in other facilities with low beta cavities in a similar frequency range. All 324 cavities used in FRIB Linac were processed in-house at MSU using BCP and exhibited satisfactory performance during testing. As part of the FRIB energy upgrade R&D, 5-cell 644 MHz elliptical resonators will be employed, desiring the use of EP and advanced techniques such as nitrogen doping and medium-T baking. The EP facility is designed to accommodate all types of cavities used in FRIB and possesses the capability for performing EP at low temperatures. Here we report the details of design and commissioning of the EP facility, highlights of encountered issues and subsequent improvements, and preliminary results from vertical tests conducted on the cavities. |
||
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2023-TUPTB016 | |
About • | Received ※ 15 June 2023 — Revised ※ 23 June 2023 — Accepted ※ 28 June 2023 — Issue date ※ 14 July 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPTB063 | Fabrication Efforts Toward a Superconducting Rf Photo-Infector Quarter-Wave Cavity for Use in Low Emittance Injector Applications | 568 |
|
||
Funding: * Work supported by the Department of Energy Contract DE-AC02- 76SF00515 The Facility for Rare Isotope Beams (FRIB), in collaboration with Argonne National Laboratory (ANL) and Helmholtz-Zentrum Dresden-Rossendorf (HDZR), is working on the design and fabrication of a photo-injector cryomodule; suitable for operation as part of accelerator systems at SLAC National Accelerator Laboratory. Project scope requires the fabrication of two 185.7 MHz superconducting, quarter-wave resonators (QWR) based, injector cavities. Cavity fabrication will be completed at FRIB with contracted vendors supporting subcomponent fabrication and electron-beam welding. Fabrication will use poly-crystalline and large grain RRR niobium materials. The current status of cavity fabrication will be presented including material procurement, prototype forming, and electron-beam welding development. |
||
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2023-TUPTB063 | |
About • | Received ※ 17 June 2023 — Revised ※ 25 June 2023 — Accepted ※ 21 August 2023 — Issue date ※ 21 August 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
FRIBA07 | Status of the SLAC/MSU SRF Gun Development Project | 1003 |
|
||
Funding: Work supported by the Department of Energy under Contract DE-AC02-76SF00515 The Linac Coherent Light Source II High Energy (LCLS-II-HE) Project at SLAC includes the construction of a low-emittance injector (LEI) and a superconducting quarter-wave resonator (QWR) at 185.7 MHz. Several alternatives to a superconducting radio frequency (SRF) QWR gun were considered for the LEI, including nor-mal-conducting RF guns evolved from the LCLS-II gun design. Compared to normal-conducting designs, the combination of an intrinsically outstanding vacuum environment (for cathode lifetime), and the potential for a larger ultimate performance envelope, led to the deci-sion to pursue development of the QWR-SRF gun. A prototype gun is currently being designed and fabricated at the Facility for Rare Isotope Beams (FRIB) at Michi-gan State University (MSU). This paper presents perfor-mance goals for the new gun design, an overview of the prototype development effort, status, and future plans including fabrication. |
||
Slides FRIBA07 [9.655 MB] | ||
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2023-FRIBA07 | |
About • | Received ※ 15 June 2023 — Revised ※ 25 June 2023 — Accepted ※ 26 June 2023 — Issue date ※ 11 July 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |