Paper | Title | Page |
---|---|---|
MOPMB010 | Analysis of Semiconductor Components as Temperature Sensors for Cryogenic Investigation of SRF Materials | 80 |
SUSPB006 | use link to see paper's listing under its alternate paper code | |
|
||
Temperature mapping systems have been used for many years to detect local heating in an SRF cavity surface or materials sample. They require a large number of temperature sensors. Most often, low-cost Allen-Bradley resistors are used for this purpose. Since they have poor sensitivity and reproducibility above 4 K, sensor alternatives that combine the precision of Cernox sensors with the low-cost of Allen-Bradley resistors would be highly desirable. In this work various semiconductor components that exhibit a temperature dependent electrical response, such as diodes and LEDs were analyzed with respect to sensitivity, reproducibility and response speed in a temperature range between 6.5 K and 22 K. In this range, many diodes and LEDs were found to be more sensitive than Cernox sensors. However, in some components the response time was slow - possibly due to poor thermal contact. | ||
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2023-MOPMB010 | |
About • | Received ※ 08 June 2023 — Revised ※ 22 June 2023 — Accepted ※ 26 June 2023 — Issue date ※ 17 July 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPTB024 | Cobotisation of ESS Cryomodule Assembly at CEA | 438 |
|
||
The assembly of cavity string in the clean room is a tedious work that has noisy and painful steps such as cleaning the taped holes of a part. CEA together with the company INGELIANCE has developed a cobot: a collaborative robot operated by an technician one time and repeating the action without the operator. The cobot can work anytime without any operators : therefore it is working at night reducing the assembly duration by some hours. The cobot consists of a FANUC CRX10 a 6-axis arm on an Arvis cart. At CEA, the cobot is used to blow the flange holes of the cavities and bellows. This allows to reduce the noisy steps that the technicians are exposed to. The process is also more reproducible since the cobot does always the same steps. The cobot is used on ESS cavity string to clean the coupler and cavity flanges. Our activities and results will be presented in this poster. | ||
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2023-TUPTB024 | |
About • | Received ※ 18 June 2023 — Revised ※ 23 June 2023 — Accepted ※ 30 June 2023 — Issue date ※ 03 July 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPTB025 | Preparation of the Assembly of the 650 MHz Low Beta Cryomodules for the PIP-II Linear Accelerator | 442 |
|
||
The Proton Improvement Plan II (PIP-II) that will be installed at Fermilab is the first U.S. accelerator project that will have significant contributions from international partners. CEA¿s scope covers the supply of the 650 MHz low-beta cryomodule sections with the cavities provided by LASA-INFN (Italy) and VECC-DAE (India) as well as the power couplers supplied by Fermilab. This scope includes the assembly of the 650 MHz low-beta cryomodules. Assembly studies have been conducted based on CEA experience acquired on previous projects as well as on the feedback of Fermilab on the assembly of the HB650 prototype cryomodule. This paper presents the organization of assembly phases from the cavity string in the clean room and the assembly of the cryostat to the preparation of the cryomodule before its shipment to Fermilab. | ||
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2023-TUPTB025 | |
About • | Received ※ 16 June 2023 — Revised ※ 23 June 2023 — Accepted ※ 29 June 2023 — Issue date ※ 07 July 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPTB026 | Measurements of High Values of Dielectric Permittivity Using Transmission Lines | 447 |
|
||
Funding: DOE Usage of lossy materials is necessary for absorption of higher order modes excited in the RF cavities. Presently, measurements of lossy materials with usage of transmission lines give errors rapidly increasing with increase of the dielectric permittivity. A method is presented for measurements of high values of dielectric permittivity epsilon in a waveguide at high frequencies with lower errors. This method supplements the method of measurements evolved for low values of epsilon and is close to resonant methods, when a sample is placed into a cavity and the measurement is done at one only frequency. The new approach with use of Microwave Studio simulations makes possible to measure this value in several frequency points at one measurement. |
||
Poster TUPTB026 [0.872 MB] | ||
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2023-TUPTB026 | |
About • | Received ※ 20 June 2023 — Revised ※ 24 June 2023 — Accepted ※ 26 June 2023 — Issue date ※ 02 July 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPTB027 | Cleanroom Assembly of the LIPAc Cryomodule | 452 |
|
||
In complement to the development activities for fusion reactors (JT-60SA & ITER), Fusion for Energy contributes to the R&D for material characterisation facilities. LIPAc is the technical demonstrator for the production and acceleration of a D+ beam that will be used for neutron production by nuclear stripping reaction on a liquid Li target. Since its first beam in 2014, the LIPAc construction and commissioning continues and will be concluded with the cryomodule installation, aiming for beam validation at nominal power. The cryomodule assembly, started in March 2019, was paused due to welding issues on the solenoid bellows. The slow pumping group used for the cleanroom assembly also needed improvement to overcome helium contamination. Two and half years were devoted to the pumping improvement and, repair, cold tests and high pressure rinsing of the solenoids. In August 2022, the cleanroom assembly resumed with the mounting of all power couplers to the SRF cavities. Despite good progress, the assembly had to be paused again to fix leaks on different vacuum components and a solenoid BPM port. This paper presents the issues faced and their solutions along the cold mass assembly. | ||
Poster TUPTB027 [2.384 MB] | ||
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2023-TUPTB027 | |
About • | Received ※ 15 June 2023 — Revised ※ 24 June 2023 — Accepted ※ 29 June 2023 — Issue date ※ 16 July 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPTB029 | Measurement of Particulates under Slow Pumping after High Pressure Rinsing of Superconducting Cavity by Using Modified Slow Pumping System | 458 |
|
||
Funding: This research was partially supported by the research fund from Ministry of Education, Culture, Sports, Science and Technology (MEXT). Slow pumping system was used for particle free vacuum pumping in Superconducting rf accelerator. In KEK, recently slow pumping system was developed for the cryomodule assembly work for STF 9-cell cavities and worked well to reduce the particulates movements under pumping. However, this slow pumping system want to be used for preparation of vertical test. Before assembly work in clean room for vertical test, we normally apply high pressure rinsing. There were many waters in the cavity. Therefore, we kept one night to dry inside cavity in clean room. Unfortunately, there were some waters in the cavity even though we kept drying in clean room for one night. This water might make some icing under pumping and stop pumping in mass flow meter, which used for slow pumping to control the mass flow. Therefore, we modify the slow pumping system to be robust under slow pumping even when water exists in the cavity. In this paper, we present the modified slow pumping system in KEK and the results of the vacuum trend through slow pumping of 9-cell superconducting cavity. Under slow pumping, we measure the particulates after high pressure rinsing by using vacuum particle monitor. |
||
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2023-TUPTB029 | |
About • | Received ※ 16 June 2023 — Revised ※ 26 June 2023 — Accepted ※ 21 August 2023 — Issue date ※ 22 August 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPTB030 | Development of Automatic Cleaning and Assembly Systems in Clean Room at KEK | 463 |
|
||
At KEK, new clean work systems including vertical auto cleaning system, replacement system between blank flange and bellows, and robot arm have been developed and installed since 2020 under the collaboration between Japan and France. The main purpose is unmanned and dust-free operation in clean room to avoid performance degradation with field emission in vertical test and cryomodule test. The vertical auto cleaning system and the replacement system between blank flange and bellows have been operated successfully in 2021-2022. Currently, clean work studies related to auto cleaning and assembly is under progress by combining the blank-bellows replacement system and a robot arm. In this report, the recent status of clean works at KEK will be presented. | ||
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2023-TUPTB030 | |
About • | Received ※ 17 June 2023 — Revised ※ 24 June 2023 — Accepted ※ 26 June 2023 — Issue date ※ 30 June 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPTB031 | Operational Consideration in the LIPAc SRF with Potential Solenoid Failure Modes | 467 |
|
||
The commissioning of LIPAc (Linear IFMIF Prototype Accelerator) is ongoing at Rokkasho institute of QST for the engineering validation of the accelerator system up to 9 MeV/125 mA. Several SRF cryomodules will be required for IFMIF to accelerate deuterons from 5 MeV to 40 MeV. The prototype of the first of these cryomodules has been manufactured and will be installed and tested on the LIPAc. It holds the eight HWRs (Half Wave Resonator) and RF couplers to accelerate the beam and the eight superconducting solenoids to focus it. During the solenoid HPR process, carried out after fixing welding issues on the solenoid beam line bellows, some concerns appeared about the integrity of two solenoids. The examination with CT scanning of the solenoids revealed that one screw and a few pins had leaved their socket. Although it should be no critical problem, we tried the beam simulation with PIC code TraceWin to determine the location of solenoids whose impact will be minimized to manage in case of failure of solenoid as mitigation action. This paper presents the recommended locations of the suspicious solenoids in the cryomodule and resultant beam conditions through the beam dynamics study. | ||
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2023-TUPTB031 | |
About • | Received ※ 28 June 2023 — Revised ※ 29 June 2023 — Accepted ※ 07 July 2023 — Issue date ※ 16 July 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPTB033 | On the Way to a 10 MeV, Conduction-Cooled, Compact SRF Accelerator | 471 |
|
||
Funding: The presentation has been authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05-06OR23177. After the success of designing a compact 1 MeV, 1 MW accelerator based on conduction-cooled SRF, Jefferson Lab is now pursuing a concept to provide a tenfold increase of the beam energy. The higher energy significantly extends the range of applications for environmental remediation and industry in general. The obvious challenge for SRF is to move from a single-cell to a multicell cavity while maintaining high efficiency and the ability to operate the machine without a complex cryogenic plant. The contribution presents the latest results of this design study with respect to its centerpiece, a Nb₃Sn coated 915 MHz five-cell cavity and its corresponding RF components, i.e. FPC and HOM absorber, as well as the conduction-cooling concept based on commercially available cryocoolers. |
||
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2023-TUPTB033 | |
About • | Received ※ 19 June 2023 — Revised ※ 24 June 2023 — Accepted ※ 26 June 2023 — Issue date ※ 18 July 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |