Author: Elliott, K.
Paper Title Page
MOIAA01 FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives 1
 
  • J. Wei, H. Ao, B. Arend, S. Beher, G. Bollen, N.K. Bultman, F. Casagrande, W. Chang, Y. Choi, S. Cogan, C. Compton, M. Cortesi, J.C. Curtin, K.D. Davidson, X.J. Du, K. Elliott, B. Ewert, A. Facco, A. Fila, K. Fukushima, V. Ganni, A. Ganshyn, T.N. Ginter, T. Glasmacher, J.-W. Guo, Y. Hao, W. Hartung, N.M. Hasan, M. Hausmann, K. Holland, H.-C. Hseuh, M. Ikegami, D.D. Jager, S. Jones, N. Joseph, T. Kanemura, S.H. Kim, C. Knowles, T. Konomi, B.R. Kortum, E. Kwan, T. Lange, M. Larmann, T.L. Larter, K. Laturkar, R.E. Laxdal, J. LeTourneau, Z. Li, S.M. Lidia, G. Machicoane, C. Magsig, P.E. Manwiller, F. Marti, T. Maruta, E.S. Metzgar, S.J. Miller, Y. Momozaki, D.G. Morris, M. Mugerian, I.N. Nesterenko, C. Nguyen, P.N. Ostroumov, M.S. Patil, A.S. Plastun, L. Popielarski, M. Portillo, J. Priller, X. Rao, M.A. Reaume, K. Saito, B.M. Sherrill, M.K. Smith, J. Song, M. Steiner, A. Stolz, O. Tarasov, B.P. Tousignant, R. Walker, X. Wang, J.D. Wenstrom, G. West, K. Witgen, M. Wright, T. Xu, Y. Yamazaki, T. Zhang, Q. Zhao, S. Zhao
    FRIB, East Lansing, Michigan, USA
  • K. Hosoyama
    KEK, Ibaraki, Japan
  • P. Hurh
    Fermilab, Batavia, Illinois, USA
  • M.P. Kelly, Y. Momozaki
    ANL, Lemont, Illinois, USA
  • R.E. Laxdal
    TRIUMF, Vancouver, Canada
  • S.O. Prestemon
    LBNL, Berkeley, California, USA
  • M. Wiseman
    JLab, Newport News, Virginia, USA
 
  Funding: Work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661.
After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. During the first 12 months of user operations, the FRIB accelerator complex delivered 5250 beam hours, including 1528 hours to nine science experiments conducted with primary beams of 36Ar, 48Ca, 70Zn, 82Se, 124Xe, and 198Pt at beam energies >200 MeV/u; 2724 hours for beam developments, studies, and tuning; and 998 hours to industrial users and non-scientific programs using the FRIB Single Event Effect (FSEE) beam line. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on FRIB status and progress since SRF2021, emphasizing lessons learned during the transition from beam commissioning to machine operations, challenges and resolutions for the power ramp-up, progress with accelerator improvements, and R&D for the energy upgrade.
 
slides icon Slides MOIAA01 [7.037 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-SRF2023-MOIAA01  
About • Received ※ 20 June 2023 — Revised ※ 26 June 2023 — Accepted ※ 03 July 2023 — Issue date ※ 19 July 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPMB026 Development of Transformative Cavity Processing - Superiority of Electropolishing on High Gradient Performance over Buffered Chemical Polishing at Low Frequency (322 MHz) 145
 
  • K. Saito, C. Compton, K. Elliott, W. Hartung, S.H. Kim, T.K. Konomi, E.S. Metzgar, S.J. Miller, L. Popielarski, A.T. Taylor, T. Xu
    FRIB, East Lansing, Michigan, USA
 
  Funding: The work is supported by DOE Awards DE-SC0022994.
A DOE grant R&D titled ¿Development of Transformative Preparation Technology to Push up High Q/G Performance of FRIB Spare HWR Cryomodule Cavities¿ is ongoing at FRIB. This R&D is for 2 years since September 2022. This project proposes four objectives: 1) Superiority on high gradient performance of electropolishing (EP) over buffered chemical polishing at low frequency (322 MHz), 2) High Qo performance by the local magnetic shield, 3) Development of HFQS-free BCP and, 4) Wet N-doping method. This paper will report the result of first object, and a local magnetic shield design and simulation to reduce the residual magnetic field < 0.1 mG in the vertical test Dewar, for the object 2.
 
DOI • reference for this paper ※ doi:10.18429/JACoW-SRF2023-MOPMB026  
About • Received ※ 14 June 2023 — Revised ※ 23 June 2023 — Accepted ※ 26 June 2023 — Issue date ※ 08 July 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPMB084 FRIB Driver Linac Integration to Support Operations and Protect SRF Cryomodules 316
 
  • H. Ao, K. Elliott, D.D. Jager, S.H. Kim, L. Popielarski
    FRIB, East Lansing, Michigan, USA
 
  Funding: Work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661.
The driver linac for the Facility for Rare Isotope Beams (FRIB) at Michigan State University includes 324 superconducting radio-frequency (SRF) cavities, and the SRF particle-free beamline spans approximately 300 meters. Protecting the beamlines against contamination is critical to FRIB operations, and thus, various administrative and engineered controls have been put in place to protect the SRF cryomodules. These controls include local vacuum interlocks for cryomodule isolation, accelerator-wide interlocks, and software controls to safeguard the cryomodules and beamlines. Meanwhile, efforts are being made to provide training and develop programs with the goal of preventing critical failures during maintenance. This paper discusses the measures and approaches used for both system integration to support operations and SRF beamline protection.
 
DOI • reference for this paper ※ doi:10.18429/JACoW-SRF2023-MOPMB084  
About • Received ※ 14 June 2023 — Revised ※ 23 June 2023 — Accepted ※ 26 June 2023 — Issue date ※ 18 July 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPTB016 Summary of the FRIB Electropolishing Facility Design and Commissioning, Cavity Processing, and Cavity Test Results 419
 
  • E.S. Metzgar, B.W. Barker, K. Elliott, J.D. Hulbert, C. Knowles, L. Nguyen, A.R. Nunham, L. Popielarski, A.T. Taylor, T. Xu
    FRIB, East Lansing, Michigan, USA
 
  Funding: U.S. Department of Energy, Office of Science, Office of Nuclear Physics and used resources of the FRIB, which is a DOE Office of Science User Facility, under Award Number DE-SC0000661.
Recently, a new Electropolishing (EP) facility was con-structed and commissioned at the Facility for Rare Isotope Beam (FRIB) with the purpose of supporting advanced surface processing techniques for SRF R&D activities. The FRIB production cavities opted for a Buffered Chemical Polish (BCP) method due to its cost effectiveness and was supported by successful outcomes in other facilities with low beta cavities in a similar frequency range. All 324 cavities used in FRIB Linac were processed in-house at MSU using BCP and exhibited satisfactory performance during testing. As part of the FRIB energy upgrade R&D, 5-cell 644 MHz elliptical resonators will be employed, desiring the use of EP and advanced techniques such as nitrogen doping and medium-T baking. The EP facility is designed to accommodate all types of cavities used in FRIB and possesses the capability for performing EP at low temperatures. Here we report the details of design and commissioning of the EP facility, highlights of encountered issues and subsequent improvements, and preliminary results from vertical tests conducted on the cavities.
 
DOI • reference for this paper ※ doi:10.18429/JACoW-SRF2023-TUPTB016  
About • Received ※ 15 June 2023 — Revised ※ 23 June 2023 — Accepted ※ 28 June 2023 — Issue date ※ 14 July 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPTB039 Simulation of High Pressure Rinse in Superconducting Radio Frequency Cavities 496
 
  • B.E. Gower, K. Elliott, E.S. Metzgar, T. Xu
    FRIB, East Lansing, Michigan, USA
 
  Funding: U.S. Department of Energy, Office of Science, Office of Nuclear Physics. Resources of the Facility for Rare Isotope Beams, a DOE Office of Science User Facility, under Award Number DE-SC0000661.
The finish of radio frequency (RF) surfaces inside superconducting RF (SRF) cavities is of utmost importance as it dictates ultimate cavity performance. After the cavity surfaces have undergone chemical etching, polishing, and hydrogen degassing, the final step in surface preparation involves cleaning using a high pressure rinse (HPR) with ultra-high purity water (UPW) to remove any residue from the previous chemical processes. The complex surface geometry of cavities poses difficulties in achieving effective and thorough HPR cleaning. This study introduces a versatile simulation tool created in MATLAB, which has the potential to be applied to various SRF cavities. The detail of the algorithm used and nozzle and motion setup will be described using an FRIB 0.53 half wave resonator (HWR) cavity as an example.
 
DOI • reference for this paper ※ doi:10.18429/JACoW-SRF2023-TUPTB039  
About • Received ※ 18 June 2023 — Revised ※ 24 June 2023 — Accepted ※ 26 June 2023 — Issue date ※ 07 July 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPTB063 Fabrication Efforts Toward a Superconducting Rf Photo-Infector Quarter-Wave Cavity for Use in Low Emittance Injector Applications 568
 
  • C. Compton
    NSCL, East Lansing, Michigan, USA
  • K. Elliott, W. Hartung, J.D. Hulbert, S.H. Kim, T. Konomi, S.J. Miller, M.S. Patil, J.T. Popielarski, L. Popielarski, K. Saito, K. Witgen, T. Xu
    FRIB, East Lansing, Michigan, USA
  • M. Kedzie, M.P. Kelly, T.B. Petersen
    ANL, Lemont, Illinois, USA
  • J.W. Lewellen, J. Smedley
    SLAC, Menlo Park, California, USA
 
  Funding: * Work supported by the Department of Energy Contract DE-AC02- 76SF00515
The Facility for Rare Isotope Beams (FRIB), in collaboration with Argonne National Laboratory (ANL) and Helmholtz-Zentrum Dresden-Rossendorf (HDZR), is working on the design and fabrication of a photo-injector cryomodule; suitable for operation as part of accelerator systems at SLAC National Accelerator Laboratory. Project scope requires the fabrication of two 185.7 MHz superconducting, quarter-wave resonators (QWR) based, injector cavities. Cavity fabrication will be completed at FRIB with contracted vendors supporting subcomponent fabrication and electron-beam welding. Fabrication will use poly-crystalline and large grain RRR niobium materials. The current status of cavity fabrication will be presented including material procurement, prototype forming, and electron-beam welding development.
 
DOI • reference for this paper ※ doi:10.18429/JACoW-SRF2023-TUPTB063  
About • Received ※ 17 June 2023 — Revised ※ 25 June 2023 — Accepted ※ 21 August 2023 — Issue date ※ 21 August 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THIXA01 Investigation of Plasma Processing for Coaxial Resonators 960
 
  • W. Hartung, W. Chang, K. Elliott, S.H. Kim, T. Konomi, K. Saito, P.R. Tutt, T. Xu
    FRIB, East Lansing, Michigan, USA
 
  Plasma processing has been investigated by several facilities as a method to mitigate degradation of SRF cavity performance. It provides an alternative to removal and disassembly of cryomodules for refurbishment of each cavity via repeat etching and rinsing. Promising results have been obtained by several groups. Studies of plasma processing for quarter-wave resonators (QWRs) and half-wave resonators (HWRs) were undertaken at FRIB, where a total of 324 such resonators are presently in operation. Plasma ignition and optimization measurements were done with room-temperature-matched input couplers. Plasma cleaning tests were done on several QWRs using the fundamental power coupler (FPC) to drive the plasma. We investigated the usefulness of higher-order modes (HOMs) to drive the plasma. HOMs allow for less mismatch at the FPC and hence lower field in the coupler relative to the cavity. Before-and-after cold tests showed a significant reduction in field emission X-rays with judicious application of plasma processing.  
slides icon Slides THIXA01 [2.060 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-SRF2023-THIXA01  
About • Received ※ 01 September 2023 — Accepted ※ 02 September 2023 — Issue date ※ 02 September 2023  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
FRIBA01
SRF R&D for FRIB Linac Energy Upgrade with High-performance Medium-beta Elliptical Cavity CW Cryomodules  
 
  • S.H. Kim, W. Chang, K. Elliott, W. Hartung, K.E. McGee, E.S. Metzgar, P.N. Ostroumov, L. Popielarski, J. Rathke, T. Xu, S. Zhao
    FRIB, East Lansing, Michigan, USA
  • D.J. Bice, C. Contreras-Martinez, G.V. Eremeev, Y.M. Pischalnikov
    Fermilab, Batavia, Illinois, USA
  • B.M. Guilfoyle, M.P. Kelly, T. Reid
    ANL, Lemont, Illinois, USA
 
  Funding: Work supported by the U.S. Department of Energy under Award Number DE-SC0000661. Further support provided by the US Department of Energy under Cooperative Agreement award number DE-SC0018362.
Michigan State University is pursuing SRF R&D for FRIB400 upgrade, doubling the FRIB linac beam energy (400 MeV/u for the heaviest uranium beam) using ßopt=0.65 644 MHz 5-cell elliptical cavities. We have achieved unprecedented Q₀ in this cavity class, Q₀ = 3.5·1010 at Eacc of 17.5 MV/m in a nitrogen-doped bare niobium cavity in collaboration with FNAL and ANL. The next missions are achieving such high Q₀ in jacketed cavities and in cryomodules, achieving field-emission free performance at Epeak of 40 MV/m with reproducibility, developing a compact two-window high-power fundamental power coupler (15 kW CW), and achieving stable resonance control of cavities integrated with tuners in cryomodules. In this talk, we will present progress of the SRF R&D and discuss future plan.
 
slides icon Slides FRIBA01 [2.513 MB]  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
FRIBA07 Status of the SLAC/MSU SRF Gun Development Project 1003
 
  • S.J. Miller, Y. Al-Mahmoud, W. Chang, Y. Choi, C. Compton, X.J. Du, K. Elliott, W. Hartung, J.D. Hulbert, S.H. Kim, T. Konomi, D.G. Morris, M.S. Patil, L. Popielarski, K. Saito, A. Taylor, B.P. Tousignant, J. Wei, J.D. Wenstrom, K. Witgen, T. Xu
    FRIB, East Lansing, Michigan, USA
  • C. Adolphsen, R. Coy, F. Ji, M.J. Murphy, J. Smedley, L. Xiao
    SLAC, Menlo Park, California, USA
  • A. Arnold, S. Gatzmaga, P. Murcek, J. Teichert, R. Xiang
    HZDR, Dresden, Germany
  • M.P. Kelly, T.B. Petersen, P. Piot
    ANL, Lemont, Illinois, USA
  • J.W. Lewellen
    LANL, Los Alamos, New Mexico, USA
 
  Funding: Work supported by the Department of Energy under Contract DE-AC02-76SF00515
The Linac Coherent Light Source II High Energy (LCLS-II-HE) Project at SLAC includes the construction of a low-emittance injector (LEI) and a superconducting quarter-wave resonator (QWR) at 185.7 MHz. Several alternatives to a superconducting radio frequency (SRF) QWR gun were considered for the LEI, including nor-mal-conducting RF guns evolved from the LCLS-II gun design. Compared to normal-conducting designs, the combination of an intrinsically outstanding vacuum environment (for cathode lifetime), and the potential for a larger ultimate performance envelope, led to the deci-sion to pursue development of the QWR-SRF gun. A prototype gun is currently being designed and fabricated at the Facility for Rare Isotope Beams (FRIB) at Michi-gan State University (MSU). This paper presents perfor-mance goals for the new gun design, an overview of the prototype development effort, status, and future plans including fabrication.
 
slides icon Slides FRIBA07 [9.655 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-SRF2023-FRIBA07  
About • Received ※ 15 June 2023 — Revised ※ 25 June 2023 — Accepted ※ 26 June 2023 — Issue date ※ 11 July 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)